Skip to content
2015 Indy SP Maintenance
2015 Indy SP Maintenance
2015 Indy SP Maintenance
2015 Indy SP Maintenance
2015 Indy SP Maintenance
2015 Indy SP Maintenance

Drive Belt Break-In Procedure:
The break-in period for a new drive belt is 30 miles. During this time, vary the throttle position under 50% and limit full throttle use.

New drive belts that feature a sanded finish should be first washed with warm, soapy water and allowed to air dry prior to use.

Always take time to warm up the belt and drive line prior to operating the snowmobile. Free track and skis from the ground before engaging throttle.